PROPERTY OVERVIEW
Eastpark 70 is a Class A, master-planned business park located just west of I-70 and E-470. The park offers convenient access to major highways, with excellent connectivity from I-70. Construction is currently underway at Building 7 (2379 Ensenada Street), which is scheduled for delivery in Q4 2025.
Eastpark 70 industrial buildings:
- Building 1 – 19500 E 23rd Avenue – 357,555 SF (fully leased)
- Building 2 – 19700 E 23rd Avenue – 245,847 SF (fully leased)
- Building 3 – 19900 E 23rd Avenue – 220,247 SF (fully leased)
- Building 4 – 19522 E 22nd Avenue – 81,213 SF (fully leased)
- Building 5 – 19822 E 22nd Avenue - 158,900 SF (fully leased)
- Building 6 – 19922 E 22nd Avenue – 77,142 SF (fully leased)
- Building 7 – 2379 Ensenada Street – 117,493 SF (under construction)
- 19501 E 23rd Avenue – 14,120 SF (fully leased)
- 19551 E 23rd Avenue – 9,320 SF (fully leased)
FEATURES
Site Features
- Immediate access to I-70 via Smith Road to Tower Road
- Proximity to I-70, I-225, I-25, I-270, and E-470
- Excellent visibility from I-70
- Expansion sites available
- Master planned business park
- Zoning is I-1 Aurora with outside storage approved
LOCATION
Eastpark 70 is strategically located adjacent to I-70 and just east of Tower Road, placing tenants within close proximity to Denver International Airport. With immediate access to I-225, I-25, I-270, and E-470, the park offers unmatched connectivity across the Denver metro and key regional corridors.

AVAILABILITIES
Building 7
±117,493 SF CLASS A DISTRIBUTION SPACE | DELIVERING Q4-2025
SIZE:
±117,493 SF
DIVISIBLE:
±30,000 SF
BUILDING DESIGN:
Front-park/front-load
ZONED:
Aurora, I-1 Industrial
CLEAR HEIGHT:
32’
COLUMN SPACING:
52’ x 55’ (59’ speed bay)
LOADING:
• 29 dock-high doors
• 2 drive-in doors
PARKING:
99 spaces
TRAILER PARKING:
TBD
SPRINKLER:
ESFR
OFFICE:
±3,152 SF
OPERATING EXPENSES:
TBD
LEASE RATE:
To quote

